It’s been a while since we’ve updated our blog (blame the webmaster), but we’re making good progress. We have two of the main pods in place, Midway East and Midway West. Midway, as its name implies, is the mid-point of the railroad, and it’s also one of three major yards — and it’s now under DCC control!

The completed DCC pod for Midway West
The completed DCC pod for Midway West

On this blog, we’ve talked about the importance of bringing outside skills to the club. We’re very fortunate to have a skilled cabinetmaker as a member. Brian, who joined PMRRC in 1993 as a high school freshman, has been building the woodwork for our DCC pods.

Brian cuts wood for our DCC pods
Brian cuts plywood for our DCC pods

Meanwhile, work on our scenery continues. Zion Station, one of the landmark buildings at the western terminus of the railroad, has always sat at ground level. Now it has a sidewalk, and soon it will have a proper connection to the roadway, which means Sierra Pacific passengers will no longer have to teleport from their cars to the waiting room.

The new sidewalk under Zion station
The new sidewalk under Zion station

Most of the wire has been pulled, and last week we removed the relay panels from underneath the operating gallery. It’s a curious thing to be able to see the underside of the layout from beneath the old control panels…

The view under the control panels with the relay boards gone
The view under the control panels with the relay boards gone

Here are some of the relay boards. A lot of our old electrical components have value, so we’re salvaging what we can.

Old control relay boards
Old control relay boards

And for those who have been keeping track of our wire-pulling exploits, here’s the pile s far. It’s about to overflow the viewing gallery!

The wire pile as of 4/30/16
The wire pile as of 4/30/16